Below is a collection of notable past projects.

 

 

Snoqualmie Valley Alliance Church

Tenant improvement/renovation project with 8 large systems including distribution and controls.

General Contractor: Rafn Company

 


 

Kent HealthPoint

Removed 55 ton RTU and replaced it with a relocated 70 ton RTU. Tenant improvement also included the addition of new VAV boxes and miscellaneous duct modifications as well as a completely new control system with integration for exhaust fans and exterior lighting. We were only allowed to work on the weekends and we still came in right on schedule.

General Contractor: Abbott Construction


 

Oculus Virtual Reality

Install a 1.5 ton split system and refrigerant piping; install six exhaust fans and ducting; install 135 grilles, registers and diffusers; demo existing MUA unit and relocate rooftop unit.

General Contractor: Unimark Construction
 


 

REI, Inc.

Design/Build multiple building TI. Rezoned spaces providing new VAV boxes and new ducting.

General Contractor: Jackson Dean Construction

 


 

Marymoor Business Center (Floors 2 & 3)

Design/Build (2) Floor build out of an existing shell. Provided and installed (24) VAV boxes, with exposed spiral ducting.

General Contractor: Pattison

 


 

Disney Imaging

Provided 24 VAV boxes and duct work for this high tech tenant improvement project with a split AC system for their server room.

General Contractor: HST

 


 

Verizon

Remodel of two buildings including the installation of multiple VAV terminal units, fire smoke dampers and DDC controls.

General Contractor: Charter Construction

 


 

NEC

Chilled water CRAC unit were used instead of DX system to take advantage of the prevailing energy code economizer exemption. Redundancy was provided via dual pumps and four multi-stage compressors.

General Contractor: Pattison